Hi Kamal,
Thanks for
Material B cost (270) is displaying in costing analysis in Production version 1 i.e before marking. The same will be updated in the Material Master after release.
Same Material B is my input material in production version 2 of Main Material A, my consumption price should be as per production version 1 of CO-product B. But system is not considering this price. it is considering the Material Master price.
Regards,
KISHORE