Re: COGS in COPA and FI

$
0
0

Hi...

 

You should reconcilie FI’s COGS with CO-PA’s COGS value field which is valuated using costing key instead of this value field which is mapped with the condition type VPRS in SD.

 

You check your configuration, “Define Access to Standard
Estimate”.
(Path:Controlling>Profitability Analysis>Master Data>Valuation>

Set up Valuation Using Material Cost Estimate).

 

I recommends costing key which have “4 Released standard cost estimate matching

goods issue date" in period indicator field.(COGS in COPA = Quantity Delivered x Standard Cost Estimate at the time of PGI)


WIP calculation: KKAX / SAPKKA07

$
0
0

Hi,

 

When we want to run KKAX/KKAO in background on a recurring basis we can schedule report SAPKKA07, I believe.

Can I somewhere find this connection in the system or a documentation? E.g. a hint from transaction KKAX/KKAO that SAPKKA07 can be used or viceversa, that SAPKKA07 can be executed to use KKAX/KKAO?

 

Thank you

Exberliner

Make Segment field mandatory in profit centre.

$
0
0

Hi Experts,

 

We have IDES system. In OBA5 we have defined message 156  ‘No segment was assigned to the profit center’. We tried to created profit centre without segment and system showed error and did not allowed to create the profit centre.

 

Now in our development client, 100 we have defined the same message. When we tried to create the profit centre, instead of showing error ‘No segment was assigned to the profit center’ it is showing warning message - 052     "Segment" field is independent accounting unit. See long text.

 

I do not understand why system is behaving like this. When I have defined error for message 156 and not for 52, why its showing warning message for 52.

Please guide.

 

Regards

Zunaid

Pricing Error in KEPM Planning

$
0
0

Hi,

 

I am getting "Pricing error: Mandatory condition ZSER is missing" while valuating Sales Plan in KEPM. I have done necessary configuration related to Automatic Valuation Strategy i.e. Assigned SD costing sheet to Valuation Strategy "001" & have also activated the same in KEPM.

 

Pls advice.

 

Regards,

 

Varsha

Re: Pricing Error in KEPM Planning

$
0
0

Hi varsha,

 

Please check and confirm that you assigned SD condition type ZSER to value field..

 

 

Thanks,

Ravi

Make Segment field mandatory in profit centre.

$
0
0

Hi,

Zunaid,

 

May be in your development system some one has maintained as warning for segment field in profit center you can make the warning message in the following way.

 

If you want it to be mandatory to maintain the segment field in the profit center master data in your system, that is, that the system issues a warning or information message if the field remains empty, create message FAGL_LEDGER_CUST 156 and implement the program corrections.
***********************************************************************

    1. Use transaction SE91 to create message 156 in the message class FAGL_LEDGER_CUST.
    2. Enter the following short text: "No segment has been assigned to the profit center".
    3. Use transaction SM30 to create an entry with the following data in the table T100S:

              Application Area = FAGL_LEDGER_CUST

              MsgNo = 156

              Allowed = EIW-

              Standard = -

              Switch off = X

    4. Implement the attached program corrections.
    5. The system then issues message FAGL_LEDGER_CUST 156 if General Ledger Accounting (new) is active, the segment field in the profit center master data remains empty and the system has not already issued message FAGL_LEDGER_CUST 052.

              You can use transaction SM30 and the view V_T100C or transaction OBA5 to maintain the type of the new message.

 

For more details refer the note 1369185.

 

Regards,

Ravi.

Re: Pricing Error in KEPM Planning

$
0
0

Hi,

 

In KE4I, I have assigned ZSER to value field. I wonder why in KEPM its giving as error.

 

Regards,

 

Varsha

Re: Target cost against process order

$
0
0

Hi Srinu,

 

Thanks for your replied.

But we have 4 times G/R, 3 G/R happened in last year, last one happened in last month.

Base my understanding,  target cost for 3 G/R which posted in last year should be calculated base last year price when they are posted.

 

Target cost for last G/R which was posted in this year, should be calculated base currently price.

 

The issue is before last G/R, everything is fine, after last G/R, target cost for first 3 G/R are re-calculated and use the current price.

 

Regards

Rocky


Re: Overhead calculation through Template allocation

$
0
0

Hi Veenu

 

Greetings for the day

 

Hope you ar referring to overhead calculation according to product to be achieved from template allocation .

 

In case you are using Overhead calculation procedure instead of a costing sheet you can use

environment "1" for Plan and "9" for Actual costings .

 

Template allocation would help in formulating overhead calculation .

 

Below are the steps used in case you are using for Cost allocation to product

 

Step :

 

1) Go to transaction CPT1

 

2)  Enter the name of the template and environment 001 2. Inside the template Type = Cost Center / Activity Type

 

3) The system would now ask you for the description of the template which you can derive as per your

notificaiton

 

4) Now you need to define the object for the sender /receiver through either the cost centre combination or other code combinations

 

Sender /Cost Centre = xxxx

 

Sender Activity = AAAA

 

5) Now after inserting the above one we can proceed with Plan Quantity . Normally Alternative quantiy unit = Material Base Quantiy/Unit Condition field  = Item comparison values

 

6) Now click on Activating the Plan activation button

 

7) Now we need to assign the template to the overhead key

 

8)  Define Overhead keys : - Create a OH Key using SPRO > Controlling > Prod Cost Controlling > Product Cost Planing > Basic Settings for Material Costing > Overhead > Define OH Keys

 

9) Assign Overhead group to Overhead key : We need to go to transaction OKZ2 and create a Overhead group to assign the Overhead key which has already been created to the overhead group

 

10)  Creation of costing sheets : 

Create Cost Sheet (only code and name) in SPRO > Controlling > Prod Cost Controlling > Product Cost Planing > Basic Settings for Material Costing > Overhead > Define Costing Sheets

11) Assignment of costing sheet to OH Key and Template Environment  :

In Transaction KTPF assign Controlling Area : Costing Sheet : OH Key : Template Environment : Template

 

 

12) Assignment of overhead group in Material Master Data  :

In material master data we get the  costing 1 view tab where we would  assign the OH group to the material

 

13)  In the master data of the order we should assign the costing sheets and OH key etc so that the actual template allocation would get reflected

 

 

Actual Template allocation would happen through individula processing and collective processing from the transaction CPTA

 

In case of any detailed information still needed please revert for the same

 

Kindly check with the below points and if found useful please rate and give points accordingly

 

Regards

Devendra

 

Re: Target cost against process order

$
0
0

Hi,

 

Logically for last GR only new standard price should be use, but previous last 3 GR won't revalue with new price.

 

Are you sure about the last 3 GR revalue with new price, check carefully.

 

Regards,

Ravi.

WIP calculation: KKAX / SAPKKA07

$
0
0

Hi,

 

You can see report KKAY/KKAQ are the standard reports by using these reports we cann see the calculated WIP period wise.

 

Regards,

Ravi.

Re: Applicability of Material Ledger in Trading business

$
0
0

Thanks Srinu!!!!!!

Closing the thread.

regards,

makrand

DP93. Issue with intercompany resource related billing - no pricing docs

$
0
0

Dear, I have set-up intercompany resource related billing. DP93 tells me, allthough I fill out my intercompany sales order,  "Enter a cross-company code sales document".

In debugging I see the order I filled out is correctly picked up, but the system can't find any "pricing docs" in table v_vpkhi(LVPKDBU01 line 40).  Any idea why? What our these ‘pricing documents’? 

 

Txs !

Consolidated accounting on ERP SAP USING importing accounting entries from ERP TOTVS

$
0
0

Hello everyone!

 

I need your help.

 

scenario

company x - ERP SAP

company y - ERP TOTVS/DATASUL

 

We'll consolidate our accounting on ERP SAP.

There are some transaction that we can use to import accounting entries from text file extracted accounting ERP TOTVS/Datasul?

 

Sorry for my english ... is not very good

 

Best Regards,

Kleber Sotte.

Shipment cost and co-pa

$
0
0

Good morning,

I need to feed documentation about reflecting the shipment cost document cost (from trasportation) to CO-PA analysis, with require the trasportation charges to the single product sold to the customer.

COuld you give me a link to some docs about this matter...

Thanks a lot

Best regards

.


Re: Time settings in SAP

$
0
0

Hello Zaheer,

 

   You can change by using the transaction STZAC

 

     Find your right time zone where your server stand, You can easily  find your right time zone with the help of Google then change it in the transaction - STZAC.

 

 

Regards,

 

Farkath C

Re: Overhead calculation through Template allocation

$
0
0

Hi Veenu

 

Greetings for the day

 

Hope this issue is justified as per the view points suggested by me and Mr Rupesh

 

Regards

Devendra

Make Segment field mandatory in profit centre.

$
0
0

Hi Ravi,

 

Great will do that and update the same.

 

Regards

Zunaid

Re: KEU2 Sender Values - Variable portion

$
0
0

Hi Ronghua,

 

yes thanks. This is what i want but i do not know where to maintain this CO-PA version and what is the path or tcode to maintain that.

 

Can you please guide me. If you have any steps please let me know.

 

Regards

Zunaid

Re: Overhead calculation through Template allocation

$
0
0

Hi

 

Can you please send me screen shot for the same