Quantcast
Channel: SCN: Message List - SAP ERP Financials - Controlling
Viewing all 8508 articles
Browse latest View live

Re: is any diffrence between running con2 or abap program rkazcon2 ?

$
0
0

Hi

 

Program that runs behind CON2 is SAPLKAZB which deal with revaluation of prod/process orders. Whereas RKAZCON2 delas with revaluation of prod orders and product cost collectors. Both serves the same purpose as con2 serves.

 

This selects all orders and not only with status 'Teco or Dlv'.

 

Rajneesh


Re: is any diffrence between running con2 or abap program rkazcon2 ?

$
0
0

Hi Rajneesh.

 

Thanks for your replay. when i run con2 ,and check background processing,ask for job name, what i should input for job name ? i should create a job in sm36 and put that name here ?

 

 

regards

Mahtab

Re: OK17 Reconciliation Ledger - Assessment Cycle

$
0
0

Hi Mr. Mukthar & Aleksey

I found old created Substitution step in OK17 created by our Consultant as below

 

1.png

and the newly created by me as below

2.png

 

22.png

 

is there any difference or conflict would happen between both of them

 

Regards

Mahmoud EL Nady

Re: Current Planned Price For Material With Control Price Indicator "V"

$
0
0

Hello friends,

 

First i want to thank all your support. I have solved the issue. As i said, at plant 5030 i have a current planned price. So at KEPC i created a rule using plant 5030 as plant used for reading cost estimate and that solved the issue.

Re: OK17 Reconciliation Ledger - Assessment Cycle

$
0
0

Hi Mahmoud,

 

Yes, it will conflict it. Because in the old substitution if the GL account is exist in the set, then the GL has replaced with the substitution GL. So first check the set in GS02 and remove the GL which has defined in the new substitution prerequisite condition.

 

Regards,

Mukthar

Re: OK17 Reconciliation Ledger - Assessment Cycle

$
0
0

Hi Mukthar

Thanks for you reply.. i checked GS02 for COFI_SUBSTITUTION_OH i found that it's not containing any GL , except secondary cost element not used by me.. i believe now as per your valuable advise that it will not conflict with my new created substitution . 

1.png

 

Regards

Mahmoud EL Nady

Re: OK17 Reconciliation Ledger - Assessment Cycle

$
0
0

Hi Mhamoud,

 

Yes, it will not reflect.

 

Regards,
Mukthar

Re: Revaluation cost element category

$
0
0

Dear Kamal,

     thanks for your reply I just want to know how to deal with revaluation account in co and what is the best way and the right cost element category or i have to delete the cost element.

 

thanks

Nassar


For activity allocation the planned price is calculated automatically by system

$
0
0

Hi

 

 

Can anyone explain how for activity allocation the planned price is calculated automatically by system, Can anyone explain if any configuration is required.

Re: For activity allocation the planned price is calculated automatically by system

$
0
0

Hi,

 

1. First you have to maintain the price indicator as 3 in the activity type master 

 

2.You have to plan activity type output for each of the combination of cost center/activity type in KP26

 

3. Later you have to plan costs for the cost center/activity type in KP06

 

4. After done the above, then you have to run KSPI. Then system will calculate the price based on costs/its output.

 

Regards,

Mukthar

Re: Oracle Database Issue in SAP

$
0
0

Hi Shoaib,

 

Thanks for update.

 

Regards

Amit

Outbound Queue stucks in SMQ1 for Taxware system

$
0
0

Hi All,

 

Our system is connected with Taxware system via RFC. Entries get always stuck in SMQ1 with system fail.

We need to reactivate the queue in SMQ1 all the time to clear entries. Is there any way to solve this problem?

Please advise

Thanks in advance

 

Regards

Amit

Settlement of Cost on line item basis instead of a lump sum

$
0
0

Hi,

 

I am trying to find a way to ensure that settlement of cost from a sender to a receiver is done based on each line item in the sender.

 

Currently if I have $20 in cost element 7000, and another $30 in the same cost element (i.e.) 7000. The settlement in the receiver shows $50 in cost element 7000.

Is it possible to see $20  and $30 as separate line items in the receiver instead of a lump sum of $50.

 

Your response will be highly appreciated.

Controlling area setting issue

$
0
0

Dear All,

 

We have a critical question regarding the suitable setting for a Controlling company Code.

Let me explain the case: Our current controlling structure (already in Production) is grouped around a unique Controlling Company code running in EURO, with this particular setting:

 

Assignment control:

CoCd--->CO Area= Cross-company-code cost accounting

 

Currency Setting:

Currency type=20

Currency= EUR

Diff. CCode Currency is flagged

 

 

Up to now, all the Financial company codes attached under this Controlling Company Code setting, run in EURO, so there are no problems to see the accounting and cost information (profitability CO-PA and costing CO-PC),  in EURO currency, obviously.

 

However, now we are going to attach a new Financial Company running in GBP, and it will work with a double currency: GBP as the company currency, and EUR as grouping currency.

 

Now, with the current CO setting I have told you before:

 

Will I be able to view the controlling information in GBP when limiting the view only to this new Financial Company (which runs in GBP)?

By extension,  will I be able to view the controlling information in EUR when I want to see the aggregated costing & profitability information of all the companies, including of course the Financial company code running in GBP?

 

In the end, what I want to know is if I will be able to see the costing information in GBP and EUR, depending on what I ask for, and taking into consideration the current setting of my Controlling Company code. If not, would it be possible to change my Current type setting from '20' to '30' or better not to change this?

 

A good answer to this question would be of great help and would boost our project implementation, as well as very good rewarded.

Many thanks in advance.

Re: Cost component split and semifinished product

$
0
0

Hi Kamal,

 

thank you for explanation, i thought so.... the roll up in cost component is mandatory when component is cost of goods manufactured or is for inventory valuation. I need roll up, but cost component split want to see for concrete level, so SFG 612400 as lower material in cost component 30, raw material 10. Not roll up in original source.

 

thanks Gustav


Re: Profit center not maintained properly

$
0
0

Hi Sweta

 

 

  Basic concept of profit center is to design for reporting and any change may only hit your reports not any financial entry...so In my opinion not a worried situation...

 

  1. Make/ decide a cut off date , better from start of any period

 

  2. Create new profit center  as required under proper hierarchy

 

  3. Before cut off date, better at last day transfer all data from wrong PC to correct one

 

  4. Also see any open orders related to old PC is pending..either make them correct or cancelled

 

 

 

Kamal

Re: Cost component split and semifinished product

$
0
0

asw.png

it does not matter where, because it is the same everywhere, Kamal is right. I understand this concept, but i need another view of CCS. I don´t know whether it is possible. If not in stadnadard, how in non-standard?

 

Gustav 

Re: Cost component split and semifinished product

$
0
0

Hi Gustov

 

   As I explained Itemization is one way of seeing the cost where you can see original source wise and CCS view is another way of seeing the cost basically roll up view and also at CE level. If you go in depth...

 

1. In itemization main source we assign in BOM, Routing, Costing Sheet, Additive cost etc are being shown at different actegory

 

2.In CCS all above source are broken to CE assign to CCS attributes...so one is header and another is line items

 

 

kamal

Re: Internal Order -G/L Mapping

$
0
0

This G/L is itself created as Cost element and there exists no order assigned  in the master data of this cost element as well.Pl. advise further

Re: Cost component split and semifinished product

$
0
0

Well Kamal, i understand.

 

Is there in SAP a report where i see FERT material (the highest) with all cost element from all levels of BOM? Do you have experience with userexit in CK11N - cost - user exit display - cost report 1-3?

 

Thanks a lot, Gustav

Viewing all 8508 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>