Re: Primary Cost Component Structure Not Updated in CK11N


S_ALR_87013019 commitments not displayed

$
0
0

Hello Experts,

 

We have AuC assets which has automatic internal order assignment and Non AuC assets without internal order during PR/PO creation. When we display commitments in S_ALR_87013019 report, only those AuC assets are reflected. Reasonable, since the only parameters that this report has is internal order and internal order group.

 

Are there any related configurations that can enhance this report so that commitments for both AuC and Non-AuC assets are displayed? If not, is there a more appropriate report to display commitment budget for those PR/PO without internal order assignment.

 

Thank you very much!

Jack

Re: Primary Cost Component Structure Not Updated in CK11N

$
0
0

Hi Anurag

 

Don't define Activity CE in combine with primary CE...

 

Make separate attribute for activity CE and break up to relevant attribute for primary CE

 

 

 

Kamal

Re: Valuation with material cost estimate: error with product "XXXX"/KE350 Error

$
0
0

Hi,

 

I have 10 plants where costing is run.  In such case?

 

Regards

Ruksana

Re: Valuation with material cost estimate: error with product "XXXX"/KE350 Error

$
0
0

Ruksana

 

 

  Then I think will be difficult to define one plant. In depot level only we can update standard cost if mat having Pr control S through Transfer Control in valuation variant even it is manufactured in other plant

 

  Can you test by defining a plant? if it works then can think an option..because I never tried

 

 

  Kamal

Re: S_ALR_87013019 commitments not displayed

$
0
0

Hi Jack

 

This report works only with internal orders

 

For non Auc assets, unless you assign a IO in the asset master, wont be successful

 

You can view some MM based reports.

 

Br. Ajay M

Re: COPA Planning Quantity Both in Alternate UOM and base UOM in COPA Report

$
0
0

Hi Ajay,

 

Thank for your replay for we have the following Enhancment

COPA0001  Enhancement for derivation in Profitability Analysis (C

COPA0002  Enhancement for valuation in Profitability Analysis (CO

COPA0003  Enhancement for assignment to profitability segment (CO

COPA0004  Enhancement for currency translation (CO-PA)

COPA0005  Enhancement for actual data update (CO-PA)

COPA0006  Enhancement for planning (CO-PA)

COPA0007  Enhancement for external data transfer (CO-PA)

COPA00RE  BW/CO-PA Data Transfer

 

Out of this we are using COPA0006. Still alternate UOM is not displaying in COPA Planning report.

 

Please also see the below ABAP code

LOOP AT t_acccr_pa INTO  wa_acccr_pa.

   CLEAR  wa_accit_pa.

   READ TABLE t_accit_pa INTO wa_accit_pa WITH KEY awref wa_acccr_pa-awref.

   IF sy-subrc EQ 0 .

 

     v_tabix = sy-tabix.

     CALL FUNCTION 'MD_CONVERT_MATERIAL_UNIT'

       EXPORTING

         i_matnr              = wa_accit_pa-artnr

         i_in_me              = wa_accit_pa-absmg_me "<<  UOM - in which you have quantity

         i_out_me             = 'BB6'                  " << UOM in which you want the quantity

         i_menge              = wa_acccr_pa-vv001      "<< quantity

       IMPORTING

         e_menge              = wa_acccr_pa-vv003       " << converted Qty

       EXCEPTIONS

         error_in_application = 1

         error                = 2

         OTHERS               = 3.

     MODIFY t_acccr_pa FROM wa_acccr_pa INDEX v_tabix .

   ENDIF.

ENDLOOP.


Even after this also quantity is not converting.


Thanks & Regards,

KISHORE CHEEDA

Integration between FICO with BI.

$
0
0

Hi Experts,

 

Can you please some body explain the integration part between FICO with BI modules ?

 

 

Thanks & Regards,

Venkat


Re: Standard cost in hard currency

$
0
0

Dear Guarav/Dear Experts,

 

I am facing the same issue as I need to see my Standard cost estimate in Hard currency, but I have not activated ML yet, so I am wondering which option should I use to activate the ML as there are a few of them (refer to the below explanation)? I just need the ML for this reason, not for any other reasons. In our SAP system we have exactly the same structure Company Code and Controlling Area currency is the same type 10 and it is EUR and additional Hard Currency in our Company code.

 

Could you please clarify the few points below in your message saying "We activated ML".

 

1) How have you activated it?

- ML activated using multiple currencies ONLY (Price determination 2)

                                OR

- ML activated using multiple currencies and actual costing (Price determination 3)

AND which one of the below options

0 No activity update

1 Activity update not relevant to price determination

2 Activity update relevant to price determination

 

2) Based on your answer from 1) when you say "When we do costing"

- Do you mean when you do your Standard cost estimate?

                               OR

- Do you mean when you do your Actual cost estimate?


I will appreciate your answers and thanks a lot in advance!


Regards,

Georgi

Re: Report S_ALR_87013019 Inconsistent For Few Orders

$
0
0

Hi Fernando

 

If you can highlight the specific difference with screenshots, we can take it ahead

 

Ajay M

Re: activity rate calculation

$
0
0

hi... Rajneesh saxena

 

 

 

Below report of my cost center is 212010 and my cost element is 440000 is how sysetem will calculte the plan costs and varience variable percentage.

 

 

 

.SLR.PNG

 

 

Thanks and regards

p.ramkey

kkbc_kun error2

$
0
0

hi..team

 

 

 

When i was ran the kkbc_kun the error may arise

what can i do my configuration

 

 

No data exists for the analysis object

Message No. KN071

Diagnosis

No values were found for the object specified

 

 

Thanks and regards

P.Ramakey

Re: activity rate calculation

$
0
0

Hi

 

You mentaioned in you post that you have planned 300000 but in current screen shot the value is 600000/- Kindly advise.

 

Also I requested you that activity planning should also be there which I am not seeing in your present screen of S_ALR_87013611.

 

Third, Probably you are having some other cost also on this cost center which may be activity independent. Is it the case? Better if you give full details.

 

Regards

 

Rajneesh

Re: Valuation with material cost estimate: error with product "XXXX"/KE350 Error

$
0
0

Hi Ruks

 

(1) - Preferably, I will have a separate material type for Scrap and just not assign the Costing Key to that Material Type

 

If that is not possible for you, you have to rely on KEPC and not KE4J.. Assign a Material Group for Scrap to such materials and derive a Costing Key (that does not issue Error message) based on this material Group

 

(2) You should rely on KEPC to exclude a Plant.. But there can be many IFs and BUTs.

 

a) It depends on how many Mfg plants you have . If you have one its easy. In the Costing Key you can assign that Plant...

 

b) If you have multiple plants, but a material is manufactured in one specific plant only. Still it is manageable as you can hardcode the Plant in the Costing Key on some basis

 

(c) If you have multiple plants and same material is made in multiple plants, then you have to rely on Batch Management in Mfg Plants or Split Valuation in Depot Plant, so that you trace the Material to its Origin (Mfg Plant) and then derive Cost Estimate from that plant

 

Regards

 

Ajay M

Re: activity rate calculation

$
0
0

Hi...sir

 

 

yes before that i have planned that it will shown 600000 ,

 

 

 

Thanks and regards

p.ramkey


Re: kkbc_kun error2

$
0
0

Hi Kittu,

 

First of all sorry for not answering for your earlier question

 

1. Check your plan cost in VA03 environment tab cost report after costing run in your sales order

for better understanding of plan cost in sales order go through following linkof  Ajay Maheshwari SAP Trainer

Sales order - show total plan costs (from produ... | SCN

 

2. KKBC_KUN is show plan vs actual cost So your actual cost come from production order where you create your production order with reference of your sales order

 

3 So in KKBC_KUN check overview button next to execution which show sale order hierarchy give details that for which production order your sales order is taken.

 

4. If sale order costing is not done but this sales order used for creating production order then KKBC_KUN show only actual cost.

If any query revert back.

 

Regards

Prasad

Re: COPA Planning Quantity Both in Alternate UOM and base UOM in COPA Report

$
0
0

Hi Ajay,

 

Thanks for your info. and we have used COPA0002 enhancement. Now it is converting alternate UOM also. The code

 

is

WHEN lc_1000.    "if Operating concern is 1000

 

   lv_ip_qn lw_ce11000-vv001.

 

    CALL FUNCTION 'MD_CONVERT_MATERIAL_UNIT'

       EXPORTING

         i_matnr              = lw_ce11000-artnr

         i_in_me              = lw_ce11000-VV001_ME "<<  UOM - in which you have quantity

         i_out_me             = 'BB6'                  " << UOM in which you want the quantity

         i_menge              = lv_ip_qn      "<< quantity

       IMPORTING

         e_menge              = lv_op_qn       " << converted Qty

       EXCEPTIONS

         error_in_application = 1

         error                = 2

         OTHERS               = 3.

 

     lw_ce11000-vv003 = lv_op_qn .

 

     ep_target = lw_ce11000.


Once again thanks a lot


Regards,

KISHORE CHEEDA

Re: COPA Planning Quantity Both in Alternate UOM and base UOM in COPA Report

$
0
0

Hi Kishore

 

Please close the thread always, by marking relevant answer ad CORRECT ANSWER

 

it helps others to refer the solution in future

Re: activity rate calculation

$
0
0

Hi

 

OK.

 

What about my second and third para? n the same context I would also like to know that do you have any plan splitting structure created  and run that str.?

 

Regards

 

Rajneesh

Re: GR55 Report

$
0
0

Hi Preety

 

Did you default the decimal places in the GRR1 ? If not, can you do that using "Number Format"

 

On (2), I did not understand. can you give screenshot?

 

are you saying the % should not show infront of every row, but only the rows in which you did calculation? If yes, you can double click on the cell and make it specific to that

 

Br. Ajay M