Hello Elnady,
Have u maintained default Cost Centre in the settlement profile? and also Check the settlement profile in the order type.
In the settlement Profile valid receivers can be Cost Centre, Material, Assets etc.
Maintenance order generally hit PM Work Centre. Let me put it clearly, so that you can decide which cost centre should actually be assigned to maintenance Work Centre.
Every Machine is assigned to a Cost Centre. Cannot Create a Machine/Work Centre with out assignment of Work Centre. Work Centres creation is a part PP consultants. But when we talk about PM Work Centres which is having Equipment and referred to PP Work Centres in total or part of a machine based on maintenance and importance of each part of the Machine.
In simple, without creation of PP Work Centres cannot able to create PM Work Centres. What ever Cost Centre maintained in PP Work Centre , will be same as PM Work Centre.
Asset Master, Equipment Master, Work Centre will flow in one Boat. All these Masters will hold same Cost Centre.
Here no need to create a separate Cost Centre for PM Maintenance. When Notification is created automatically Asset, Work Centre and Cost Centre will be assigned. When u do settlement of the PM Order, then automatically Values flow respective Cost Centre.