Quantcast
Channel: SCN: Message List - SAP ERP Financials - Controlling
Viewing all 8508 articles
Browse latest View live

Re: How can I count for the Actual Activity type/Material quantity & prices after month end

$
0
0

Hi Arturo

Are you also suggesting to pass a provisional FI Entries???

 

Im not really sure whether i fully understood your FI Comments, Can you please elaborate on that, what is the concept of having a provisional entries? and what exactly need to be done?


Re: Problem in COPA assessment KUS5

$
0
0

Hi Aravind,

 

your requirement is not entirely clear, but if it is this:

 

for each primary cost element on a cost center you want to use the corresponding secondary cost element in the assessment to COPA.

 

then the solution ist the following:

 

Go to KSES and define an allocation structure that maps each of your relevant primary cost elements to the corresponding secondary cost element.

In KEU5, in each segment of your cycle, enter the allocation structure you just created and leave the field for Assessment Cost element blank.

 

This way you will be able to identify the original primary cost elment from the cost centers in your costing based COPA (through the correspondence with the secondary cost element used to post the allocations) which I think your requirement amounts to.

 

Regards

Nikolas

Re: Error FS217 while executing MIRO (logistic invoice verification)

Re: Inability to delete non-standard cost center group

$
0
0

Hi..

 

 

First, You should remove cost center group from used
lists(ex:allocation cycle, allocation structure, transfer structure, splitting structure, report layout ,etc)

of cost center group.

 

If cost center group is group of standard hierarchy you delete or

change cost center group using t-code OKKEN.

If cost center group is group of non-standard hierarchy you delete or

change cost center group using t-code KSH2.

If cost center group of non-standard hierarchy have
group of s
tandard hierarchy as lower group, you remove standard
hierarchy group f
rom non-standard hierarchy group and delete
non-standard hierarchy group a
nd delete Standard hierarchy group.

Re: Value Field changed from Amount to Quaintity

$
0
0

Hi..

 

Refer to below picture..

 

kea0.png

Re: residue settlement

$
0
0

Hi

 

change manually the percentages in maintenance order as required IW32-extras- settlement rule- percentages

 

Krishna

Re: CK11N error

$
0
0

Check in KP26 of for the activity in cost center if Activity Price for given period activity for CA02 is exist. If not you need first maintain values for the activity in KP26 for the period and then do ck11n.

 

Best Regards

Hrusikesh

Re: CK11N error

$
0
0

Dear Anagha

 

Have u done indirect activity allocation for this activity? Kindly check your Cost component structure, whether this activity type is mapped in your cost component structure?

 

Regards

 

Rajneesh Saxena


Re: CK11N error

$
0
0

Hi Dear,

 

Please check the settings below in Customizing:

  • Check the activity type settings for price in transaction KP26 (master data of the activity type). If it is '1' the price should be calculated automatically through transaction KPSI Plan price calculation.
  • Check your customizing settings in: Controlling > General Controlling > Organization > Maintain Version.
  • Select the Price Calculation tab of your fiscal year settings. This is the structure that is used in transaction KSPI (CO-OM) to create Primary Cost Component split; and that this may differ from the one defined in transaction OKTZ and used in transaction CK11N.
  • Check the transfer structure settings in transaction OKTZ.
  • Make sure that the Activity Price has a cost component split in the CO-OM report and that the transfer structure is defined for the case where a different cost component split is used in CO-OM than in CO-PC.  You can use report in transaction S_ALR_87013644. If there are no results in report transaction S_ALR_87013644, this means that the cost component split calculation in CO-OM is missing.
    Please note that manual activity prices do not create cost component split, you need to run the plan price calculation in transaction KSPI in order for the cost component split to be carried out in CO-PC. If it is '3' the price should be set manually through the transaction KP26
  • Re: Error FS217 while executing MIRO (logistic invoice verification)

    production order against sales order stock.. Co documents not updates?

    $
    0
    0

    Hi,

     

    While doing goods receipt from production order against sales order stock it’s generating material document but in display mode there is no accounting documents. In that case we fiend below error

     

    Document Number.........002695

    Controlling Area......... xyz

    Fiscal Year.............. 2013

    Business Transaction..... COIN CO Through-postings from FI

     

    File       Description

     

    COBK       CO Object: Document Header

    COEP       CO Object: Line Items (by Period)

    COEPL      CO Object: Line Items for Activity Types (by Period)

     

     

    is there anything missing

     

     

    Thanks

    Sampat

    Re: production order against sales order stock.. Co documents not updates?

    $
    0
    0

    Dear Sampat

     

    Please Check whether FG material has costing views or not. Also check your material may not be having Standard Cost at costing 2 tab for the period under consideration.   If so reverse GR document then do standard cost estimate for material and redo GR.

     

    Regards

     

    Rajneesh Saxena

    Re: To exclude MR21 price differences from Material Ledger Actual costing

    $
    0
    0

    Hi Toidi,

     

    I am convinced with Arturo's method of applying the change in price. Just do the price change in the new period before you close the ML period for the previous period. If you do this, there will not be any price differences posted. Please check his blogs for full understanding.

     

    However if you do the price change in the new period after you close the old period, price differences will be captured.

     

    So just remember this rule and change the price of all materials and let us know the outcome. Good luck!

    Re: To exclude MR21 price differences from Material Ledger Actual costing

    $
    0
    0

    This is not true Venkat, using CKMVFM we cannot exclude price differences to be actualized.

    Re: To exclude MR21 price differences from Material Ledger Actual costing

    $
    0
    0

    Hi Rudi/Choi,

     

    Thanks for your inputs. In your above steps the following statement may not be true :-

     

    "When you release the new std cost for next period, the difference will be posted in PRD account. Only at the period end closing the actual cost wil be revaluate again with this price difference."

     

    According to Arturo's blogs, you can confirm that as long as you do a price change before the ML close of the previous period, there will not be any price differences posted. So the above statement is not true.


    Re: To exclude MR21 price differences from Material Ledger Actual costing

    $
    0
    0

    Hi Arturo,

     

    I agree you are the king in this area..Thanks for all your blogs and explanation. I am yet to test it but i think what you are proposing does make sense. Please keep in touch.

    Re: Profit analysis issue for Customer RMA replacement

    $
    0
    0

    Explore Note 214381.

     

    SAP does not recommend posting the COGS to CO-PA during the goods issue since in standard it is posted to CO-PA via the VPRS condition in the billing document.

     

    However in this case the You should think of switching off the VPRS posting to CO-PA during billing to avoid double posting of COGS.

     

    Best Regards

    Hrusikesh

    Re: production order against sales order stock.. Co documents not updates?

    Re: split after the actual costing

    Re: To exclude MR21 price differences from Material Ledger Actual costing

    $
    0
    0

    Sanjay,

     

    Regardless of in which month you post the price change for the standard, an accounting entry will be generated for the price difference, and this difference will be reallocated to next level materials in the multi-level price determination.  There is no way to prevent this from happening.  I think if you do price change for the next period before the close of the previous period, then the price difference will be waiting for you to mess up the standards in the following month-end closing.  I don't believe this price difference is going to disappear.

     

    Hope you can validate this in your testing.  I will only be happy to know that you do succeed, and twice as happy since it is Arturo's idea.

     

     

    Cheers,

    TD

    Viewing all 8508 articles
    Browse latest View live


    <script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>